beautypg.com

Initial hookup, Initial hookup -2 – Summers 84' Superroller User Manual

Page 30

background image

SECTION 3 – OPERATION

3-2

INITIAL HOOKUP:

1. Make tractor to hitch connection with locking draw pin and safety chain.
2. Retract jack and rotate into storage position.
3. Plug Lockpin Cylinder hoses into desired tractor outlet, adjust hydraulic flow rate to 35% of maxi-

mum. Insure that tips and couplers are CLEAN.

4. Plug Lift Cylinder hoses into desired tractor outlet, adjust hydraulic flow rate to 35% of maxi-

mum.

5. Plug Pivot Lock Cylinder hoses into desired tractor outlet, adjust hydraulic flow rate to 35% of

maximum.

6. Connect safety Light Kit wiring harness to 7 pin receptacle.
7. If Land Roller is in Transport Position, follow “Steps Required to Unfold from Transport to Field

Position”.

8. INITIAL CHECK – with machine in Field Position

A. After receiving or assembling your Land Roller, it is a good practice to double check the entire

machine so all fasteners are securely tightened.

B. Make sure all grease fittings are in place and greased properly.

C. Inflate tires to recommended inflation pressure (see page 4-2), check that wheel nuts are

tightened to 170 ft-lb and check that wheel bearings are correctly adjusted.

This manual is related to the following products: