beautypg.com

American Dryer Corp. Gas HSI - Phase 7/FSS AD-78 III User Manual

Page 26

background image

22

1) Gas Models

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and

sometimes neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to

the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

For gas dryers manufactured for operation at 3-phase

(3ø), the electrical connections are made at the power

distribution block located in the service box at the

rear, upper left corner of the dryer. The ground

connection is made to the copper lug also provided in

this box. To gain access to the service box contactor,

the service box cover must be removed.