beautypg.com

Accessories, Installation of a rigid probe, Installation of accessories – AMETEK 7330 Pro-Stik II User Manual

Page 3

background image

3

Accessories

(Purchased separately)

(a) Compression Fitting, 5/8” to ¾” NPT, Stainless Steel

(b) Adapter Bushing, 2” NPT to ¾” NPT, Stainless Steel

(c) A 2 inch, 316 Stainless Steel float.

(d) A 316 SS Spacer to insure the float-magnet is

always in the active span.

(e) A 316 SS “E-Clip” to hold float on to the probe.

(f) ECTFE (Ethylene Chlorotrifluoroethylene) 2 piece

Halar® end cap with spacer. A plastic end cap is

recommended when probe is resting on the bottom

of a metal tank.

Halar® is a Registered Trademark of Ausimont USA, Inc.

Installation of a Rigid Probe

Installation of Stainless Steel Probe

1. Insert bottom end of probe into tank.

Do not allow the float to drop suddenly since it can

damage the retainer at end of probe.

2. Thread bushing into tank or flange. Bolt flange into

position.

3. Thread compression fitting into bushing or flange.

4. Hand tighten. To insure compression fitting is

sealed, turn fitting ¼ turn after hand tightening.

Make final check to see that all bolts and screws are in

proper position and probe is securely tightened.

Installation of Flex Probe

Special instructions are provided for the installation

of PVDF probes. See the Flex Probe Installation &

Handling Procedure document Z190.

(a)

(b)

(c)

(d)

(e)

Installation of Accessories

1. The normal sequence for assembly of the probe is

as follows:

a. Slide on compression fitting (a) for Style S, M or

R probe.

OR

b. Slide reducing bushing (b) or flange (customer

supplied) on for Style D probe.

2. Slide float (c) onto probe. Magnet is located in

middle of 316 SS float, so orientation of float does

not make any difference.

3. Slide spacer (d) onto the tube.

4. Capture all of these parts with E-Clip (e) or ECTFE

end cap (f). The Halar® end cap is held in place by

the retainer.

(f)

Spacer

Retainer

End Cap