GE ZV925SLSS User Manual
Page 20

20
STEP 5 INSTALL LOWER STRUCTURE
TO UPPER STRUCTURE
• Slide lower frame into
the upper frame. Match
the marked alignment
holes.
• Secure the upper and
lower frame with 16
screws, 4 on each side
of the frame.
Installation Instructions
,167$//$7,21³5(&,5&8/$7,1*
STEP 6 INSTALL BLOWER/MOTOR
• Raise the blower/
motor piece toward the
assembled frame.
• Carefully raise the motor
to the marked reference
point while making sure
the duct piece slips over
the blower outlet flange.
• Secure the blower/motor
to the frame using 16
screws, 4 on each side.
• Use tape to seal the duct
connection.
See also other documents in the category GE Hoods:
- JV536HSS (40 pages)
- JV666HSS (36 pages)
- JV536HSS (2 pages)
- JN327HWW (16 pages)
- JV347HCC (2 pages)
- PV970NSS (2 pages)
- PV976NSS (52 pages)
- JV566HSS (2 pages)
- JV936DSS (2 pages)
- JV636HSS (2 pages)
- JVE40STSS (32 pages)
- JVE40DTBB (2 pages)
- JV535HWW (2 pages)
- JN327HWW (2 pages)
- PV976NSS (2 pages)
- JV348LSS (2 pages)
- JV665HBB (2 pages)
- JV394SBB (2 pages)
- JV930SCBR (8 pages)
- PV977NSS (60 pages)
- PV977NSS (2 pages)
- JV966DSS (2 pages)
- CV966TSS (2 pages)
- JV694SBB (2 pages)
- JV960SCBR (8 pages)
- JV367HWW (2 pages)
- JVE40STSS (2 pages)
- JV960SCBR (2 pages)
- CV936MSS (2 pages)
- JV930SCBR (2 pages)
- JV666HSS (2 pages)
- ZV48TSFSS (4 pages)
- ZV48RSFSS (12 pages)
- ZV48RSFSS (9 pages)
- ZV30SSFSS (16 pages)
- ZV48TSFSS (3 pages)
- ZV36SSFSS (4 pages)
- ZV36SSFSS (3 pages)
- ZVC42LSS (32 pages)
- ZVC48LSS (2 pages)
- ZVC42LSS (4 pages)
- ZVC42LSS (68 pages)
- ZV36RSFSS (3 pages)
- ZV36RSFSS (4 pages)
- ZV30HSRSS (3 pages)