Installation instructions, Step 1 mount template, Step 2 adjust frame height – GE ZV925SLSS User Manual
Page 12

12
• Align the template with the marks on the ceiling
and tape in place.
– Be sure the template is oriented correctly with the
front of the hood.
• Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximately 1-1/2" deep.
• Drive 4 hex head wood screws into the center of
the ceiling joists and cross framing. Leave a 1/4"
gap to allow the screw head to engage the keyhole
slots on the support frames.
• Cut the 8-1/2" duct opening through the sheet rock.
STEP 1 MOUNT TEMPLATE
Installation Instructions
STEP 2 ADJUST FRAME HEIGHT
•Measure exact ceiling height.
• Find the exact frame height
required on the chart on page 6.
• Remove 2 screws on each of the
4 sides of the frame to loosen the
upper structure, lower structure
and blower/motor.
• Adjust the height “X”, according to
the chart on page 6. Use a total of
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.
1/4" Gap
24"min.
30"max.
36"min.
Frame
height
2-3/4"
Ceiling
height
X
49-80406
Printed in Italy 04-06 JR
36≤ Hood
Template
8-1/2
≤Dia.
Cut a 1≤ Dia.
Wire Access
Hole
Cut a 1≤ Dia.
Wire Access
Hole
Drill 3/16≤
Pilot Holes
Approx. 1-1/2≤
Deep
Drill 3/16≤
Pilot Holes
Approx. 1-1/2≤
Deep
10-1/16≤ to
Centerline
of Holes
7-1/16≤ to
Centerline
of Holes
FRONT OF HOOD
7-1/16≤ to
Centerline
of Holes
,167$//$7,21³9(17('727+(2876,'(