Installation instructions – GE ZV925SLSS User Manual
Page 13

13
Installation Instructions
STEP 3 CUT DUCT TO LENGTH FOR
VENTED INSTALLATION
• Measure from
house duct to
exhaust opening.
• Cut the 8" duct
length to size.
• Slip duct over the
exhaust opening.
• Seal the connection
with duct tape.
Duct
House
duct
Frame
height
Duct
length
STEP 4 INSTALL THE SUPPORT FRAME
• Raise the support toward
the ceiling.
• Thread the house wiring
through one of the large
holes, preferably on the
left side.
• Carefully engage the
ceiling mounting screws
to the keyhole slots AND
the house duct in the top
of the frame.
• Tighten the 4 mounting
screws against the frame.
• Install 2 safety screws.
• Use duct tape to seal the
duct connection at the top.
Duct
STEP 5 INSTALL HOOD ATTACHMENT
SCREWS
• Install 4 hood attachment screws in the bottom of
the support as shown. Leave 1/4" gap between
screw head and support flange.
Safety
screws
Keyhole
slots
House
wiring
Keyhole
slots
Install 4
attachment
screws
,167$//$7,21³9(17('727+(2876,'(
- JV536HSS (40 pages)
- JV666HSS (36 pages)
- JV536HSS (2 pages)
- JN327HWW (16 pages)
- JV347HCC (2 pages)
- PV976NSS (52 pages)
- PV970NSS (2 pages)
- JV566HSS (2 pages)
- JV936DSS (2 pages)
- JV636HSS (2 pages)
- JVE40STSS (32 pages)
- JVE40DTBB (2 pages)
- JV535HWW (2 pages)
- JN327HWW (2 pages)
- PV976NSS (2 pages)
- JV348LSS (2 pages)
- JV665HBB (2 pages)
- JV394SBB (2 pages)
- JV930SCBR (8 pages)
- PV977NSS (60 pages)
- PV977NSS (2 pages)
- JV966DSS (2 pages)
- CV966TSS (2 pages)
- JV694SBB (2 pages)
- JV960SCBR (8 pages)
- JV367HWW (2 pages)
- JVE40STSS (2 pages)
- JV960SCBR (2 pages)
- CV936MSS (2 pages)
- JV930SCBR (2 pages)
- JV666HSS (2 pages)
- ZV30SSFSS (16 pages)
- ZV48TSFSS (3 pages)
- ZV48TSFSS (4 pages)
- ZV48RSFSS (12 pages)
- ZV48RSFSS (9 pages)
- ZV36SSFSS (3 pages)
- ZV36SSFSS (4 pages)
- ZVC48LSS (2 pages)
- ZVC42LSS (4 pages)
- ZVC42LSS (68 pages)
- ZVC42LSS (32 pages)
- ZV36RSFSS (3 pages)
- ZV36RSFSS (4 pages)
- ZV30HSRSS (2 pages)