beautypg.com

Eight-bay sff hot-plug drive cage option – HP ProLiant ML310e Gen8 Server User Manual

Page 37

background image

Hardware options installation 37

19.

Power up the server (on page

18

).

Eight-bay SFF hot-plug drive cage option

To install the component:

1.

Power down the server (on page

18

).

2.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

3.

Remove the tower bezel (on page

19

).

4.

Remove the access panel (on page

20

).

5.

Remove the air baffle (on page

21

).

6.

Remove all installed drives.

7.

Disconnect the drive cage cables:

a.

Disconnect the Mini-SAS cable from the system board.

b.

Disconnect the drive power cable from the 10-pin power supply connector.

8.

Remove the LFF drive cage assembly.