beautypg.com

Verification steps – Avaya PROCURVE 2520-24-POE User Manual

Page 7

background image

TMA; Reviewed:
SPOC 11/16/2009

Solution & Interoperability Test Lab Application Notes

©2009 Avaya Inc. All Rights Reserved.

7 of 10

ProC2520-24PoE

7. Verification Steps

The following steps may be used to verify the configuration of PoE related parameters:

 Verify that the PoE Operational Status in ON at the system level by entering the

command show power-over-ethernet.


ProCurve Switch 2520-24-PoE# show power-over-ethernet

Status and Counters - System Power Status


Pre-standard Detect : On
Operational Status : On
Usage Threshold (%) : 80

Chassis power-over-ethernet:

Total Available Power : 195 W
Total used Power : 5 W +/- 6W
Total Remaining Power : 190 W

 Verify that Power Enable is Yes at the port level by entering the command show power-

management brief.

ProCurve Switch 2520-24-PoE# show power-over-ethernet brief

Status and Counters - Port Power Status

PoE | Power Power Alloc Alloc Actual Configured Detection Power
Port | Enable Priority By Power Power Type Status Class
----- + ------- --------- ----- ------ ------ ----------- ----------- ------
1 | Yes low usage 17 W 0.0 W Delivering 0
2 | Yes low usage 17 W 0.0 W Searching 0
3 | Yes low usage 17 W 0.0 W Searching 0
4 | Yes low usage 17 W 0.0 W Searching 0
5 | Yes low usage 17 W 0.0 W Searching 0
6 | Yes low usage 17 W 0.0 W Searching 0
7 | Yes low usage 17 W 0.0 W Searching 0
8 | Yes low usage 17 W 0.0 W Searching 0
9 | Yes low usage 17 W 0.0 W Searching 0
10 | Yes low usage 17 W 0.0 W Searching 0
11 | Yes low usage 17 W 0.0 W Searching 0
12 | Yes low usage 17 W 0.0 W Searching 0