APC 60-80kW User Manual
Page 3

990-4051
Installation Guide APC Silcon 60-80kW 400V UPS
3
Contents
1.0
Introduction 5
1.1
Tools and Equipment
5
2.0
Unpacking 6
3.0
Installation 8
3.1
Requirements on Site
8
3.1.1
Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table:
8
3.2
Footprint
9
3.2.1
800mm Cabinet for 60-80kW UPS
9
4.0
External Connection
10
4.1
Connecting the UPS
10
4.2
System Integration Interface
12
4.2.1
Connections
13
4.3
Parallel Board
14
4.4
Communication Interface Board
17
4.4.1
Connections
17
4.5
Connecting of APC Silcon Tripel Chassis
18
4.6
APC Silcon Triple Chassis
19
4.6.1
Safety Warnings
19
4.6.2
Product Description
19
4.6.3
Installing Management Peripherals
20
4.6.4
Powering the APC Silcon Triple Chassis
22
4.6.5
Troubleshooting
23
4.6.6
Product Specifications
24
4.7
APC Silcon Battery Cabinets
27
4.7.1
APC Silcon Battery Cabinets
28
4.8
Battery Breaker Box/Fuse-box
30
4.8.1
Battery Breaker Box
31
4.8.2
Battery Breaker Box Connection Diagram
32
4.8.3
Fuse-box
33
4.8.4
Fuse-box Connection Diagram
34
4.8.5
UPS with External Battery in Battery Breaker Box/Fuse-box Configuration
35
5.0
Programming Parameters
36
5.1
Parameters
36
5.1.1
Programming Keys
37
5.1.2
Programming Example - Switch to Bypass Operation
38
5.2
System Configuration
38
5.2.1
Programming Example - Change Charge Voltage to 446
40
5.2.2
Programming Example - Change to Output Isolation Transformer available
41
5.3
Programming Parameters for Advanced Parallel Operation
42
5.3.1
Description of Settings
42
5.3.2
Programming example
43
5.4
Battery Monitor
43
5.4.1
Installation of new batteries
43
6.0
Options/Accessories 44
6.1
Service Bypass Panel for Single Operation
44
6.1.1
Wiring up UPS with SBP in TN-C-S Network
46
6.1.2
Wiring up UPS with SBP in TN-S Network
46
6.1.3
Operating The External Service Bypass Switch
47
6.2
Service Bypass Panel for Parallel Redundant Operation
49
6.2.1
Two Parallel Systems with Service Bypass Panel
50
6.2.2
Parallel/Redundant Operation with Service Bypass Panel and External Battery
via MCCB
51
6.2.3
Operating External Service Bypass Switch for Parallel Systems
52
6.2.4
Isolating One UPS for Service/Maintenance
56
6.2.5
Switching Back to Normal Parallel/Redundant Operation
57
6.3
Intersystem Synchronization Unit
58
6.4
Relay Board
59