Ouellet OWS User Manual
Page 19
19
Mechanical
joint
The exit point of the conduit
must be completely embedded.
Distance between the top of the cable
and the finished surface of the coating:
Minimum: 2'' (50 mm)
Maximum: 3.5'' (89 mm)
Compacted base layer
Minimum: 2'' (50 mm)
Compacted manually applied layer
Minimum: 0.5'' (13 mm)
Compacted wearing course
Minimum: 1.5'' (38 mm)
Maximum: 3'' (76 mm)
Mechanical joint
minimum 6'' (152 mm)
inside the surface
to be heated
Galvanized steel strapping
anchored to base layer
Compacted and drained
granular base
A
A
B
B
C
C
Figure 12: Asphalt coating
See also other documents in the category Ouellet Water boiler:
- OAC (1 page)
- OACP (1 page)
- OAE (1 page)
- OCH (1 page)
- OCH-RF (1 page)
- OCH-WB (1 page)
- OCP (1 page)
- ODL (1 page)
- ODS (3 pages)
- OFH (1 page)
- OFM (1 page)
- OHY (4 pages)
- ORC (2 pages)
- OTM (26 pages)
- OTR (26 pages)
- OVB-HL (16 pages)
- OVB-QS (22 pages)
- OVE (2 pages)
- OVN (4 pages)
- OVR (1 page)
- OVS (1 page)
- OWC-M (26 pages)
- OWC-R (24 pages)
- UFO-R (24 pages)
- WHFC (2 pages)
- RBH (2 pages)
- OAWH (1 page)
- OCA (1 page)
- OCB (1 page)
- ODIA (1 page)
- OEC (1 page)
- OHB (1 page)
- OLA (1 page)
- OLI (1 page)
- OMB (1 page)
- OPA (1 page)
- OPI (1 page)
- OPR (1 page)
- OAF (5 pages)
- OAM (4 pages)
- OAS-MD (1 page)
- OAV (1 page)
- OCC (1 page)
- OHV (4 pages)