Mechanical

joint

The exit point of the conduit

must be completely embedded.

Concrete slab

4'' (101 mm) to 6'' (152 mm)

Mechanical joint

minimum 6'' (152 mm)

inside the surface

to be heated

Distance between the top of the cable

and the finished surface of the coating

Minimum: 2'' (50 mm)

Maximum: 3.5'' (89 mm)

Wire mesh

Compacted and drained

granular base

Plastic tie-wraps

Sand base

Expansion joint

Compacted

and drained

granular base

Compacted and

drained granular base

Detached cable

Heating cable

Concrete slab

Concrete slab

Control joint

Maximum depth

1'' (25 mm)

Angle iron

1'' x 1''

Figure 9: Concrete coating

Figure 10: Bypass of expansion joint

Figure 11: Crossing a control joint

Do not roll over uncovered cables with any equipment.
Special precautions should be taken while walking over the cable
and while handling sharp tools during the installation process.

CAUTION!

Work stages should be planned so the cable does not remain
uncovered between the installation and the coating stages.
Where the project encounters any delay between these stages,
special precautions should be taken to mechanically protect
the cable against any breakage.