Installation, Panel installation, Battery installation/replacement – Badger Meter Test Equipment User Manual
Page 6: Installation 6
INSTALLATION
Panel Installation
Slide the included gasket over the rear of the unit Place the unit in the panel through a 33 mm x 68 mm cutout Use the
provided panel mount screws to tighten the mounting clips until there is a secure seal against the gasket Do not over tighten
Slide the mounting clips into the grooves in the side of the ER-10
Du ran t
Recommended
Panel Cutout
2.677" (68 mm)
1.299"
(33 mm)
RST
T / R
8-digit LCD
display
®
Front View
Reset/
programming
button
Plastic
front panel
sealed to
meet
NEMA 4X
Mode select/
programming
button
Gasket installed
Install mounting clip
Figure 1: Panel installation
Battery Installation/Replacement
The ER-10, ER-10/R & ER-10H are powered by one 3V Lithium battery each To replace or install the battery, remove the battery
cover by pushing inward and down, in the direction of the arrow Install the battery in the slot Once the battery in place, the
unit goes into a self-test mode, and all the segments on the LCD display illuminate To exit the self-test mode, press
The
unit then displays the model number 10 for the ER-10 Press
again to ready the unit for operation
Figure 2: Battery installation
Model ER-10, ER-10/R & ER-10H Industrial Register
Page 6
September 2013