beautypg.com

Installation – KROHNE OPTIMASS 2000 EN User Manual

Page 19

background image

INSTALLATION

3

19

OPTIMASS 2000

www.krohne.com

10/2010 - 4000810002- MA OPTIMASS 2000 R02 en

3.4.3 Side mounting

The meter can be installed with the converter (or remote junction box) on the side of the meter
so that the measuring tubes are sitting one above the other. Avoid this method of installation
where there is a two phase process flow, or where the process fluid contains gas. If this situation
cannot be avoided, please contact the manufacturer for advice.

3.4.4 Cross talk

Where more than one meter is being installed, a very high level of immunity to cross talk means
that the meters can be mounted within close proximity to each other. The meters can be
mounted either in series or parallel, as shown.

Meters in series

INFORMATION!
Where the meters are installed in series, it is strongly recommended that the process pipe
diameter remains constant. For more information, please contact the manufacturer.

Meters in parallel

MA_OPTIMASS2000_en_101022_4000810002_R02.book Page 19 Monday, November 22, 2010 5:47 PM