beautypg.com

Inst, Tallatio, On instr – Ventamatic CX1000 User Manual

Page 2: Ruction

background image

THIS
INTA
NET
LABE

Step
Plac
cent
posit
the h









Step
Whe
cent
insid
hole
follow












Step
Draw
the r
the h
in St
the c

ROOF-MOUN

KES ARE LOC
FREE AIR INT

EL FOR AMPER

p 1

ce unit on top

er of the roo

tioned so the

house.

p 2

en this positio

erline direct

de the roof, d

will be used

wing operati

p 3

w a referenc

roof using
hole drilled

tep 2 as

center.

NTED UNIT IS D

CATED AROUN

TAKE IS REQU

RAGE.

p of shingles

of and close

e unit is only

on is establi
ly between t

drill a hole th
d as a refere

ions.

e square 25

INST

DESIGNED FO

ND THE EAVE

UIRED PER UN

s, approxima

to the ridgel

y visible on o

shed, locate

two rafters a

hrough the ro

ence point fo

5 3/8-in x 25

TALLATIO

OR ATTICS OF

S. FOR LARG

NIT. THE MOT

ately in the

line, but

one side of

e a

and, from

oof. This

or the

3/8-in on

ON INSTR

F AVERAGE S

GER ATTICS, U

TOR OPERATE


Step
With
remo
draw

Step
Nex
circl
drille
thro
cut l







Step
Slide
(som
Pos
Step


RUCTION

IZE AND OPE

USE TWO OR

ES ON 115-V.A

p 4

hin the squa

ove shingles

wn.

p 5

xt draw a 14

e on the dec

ed in Step 2

ugh the dec

line.

p 6

e the flange

me roofing n

ition the unit

p 3) to align

NS

RATES MOST

MORE UNITS

A.C. 60HZ CUR

re, draw a 1

s, nails, and

½-in diamet

cking. Be su

as a center

cking, using t

of the unit u

ails may nee

t on the refe

the exhaust

T EFFICIENTLY

S. AT LEAST 6

RRENT. SEE M

7-in diamete

felt from the

ter circle ins
ure to use th

r of this circle

the 14 ½-in

up under the

ed to be rem

erence squar

t opening.

Y WHEN AIR

600 SQ. IN. OF

MOTOR

er circle and
e circle just

ide the 17-in

he hole

e. Cut

circle as the

e shingles

moved).

re (drawn in







n

e