beautypg.com

Rl1600 i – Triton RL1600 Installation Manual User Manual

Page 5

background image

5

rl1600 i

nstallation

M

anual

This document contains the information necessary for the preparation and installation of an RL1600 Triton

ATM. It’s important that the site complies with the requirements specified in this document. In addition,

electrical wiring and mechanical systems must also comply with all relevant laws and regulations.
The site must be prepared by the customer or his agent who is fully conversant with the requirements of

installing ATM equipment. The responsibility for ensuring that the site is prepared in compliance with this

document remains with the customer.
For information and guidance only, a list is provided in general terms of those matters for which the cus-

tomer is responsible. The list is not intended to be comprehensive and in no way modifies, alters, or limits

the responsibility of the customer for all aspects of adequate site preparation.
1. Location of the equipment and site preparation.
2. Site wiring (power, communication). Ensure access will not be hindered by cabinet placement.
3. Location of other equipment that may cause electrical, electromagnetic or heat induced interfer-

ence.

4. Make building alterations to meet wiring and other site requirements.
5. Install all communication cables, wall jacks, and associated hardware.
6. Provide and install necessary power distribution boxes, conduits, and grounds.
7. Ensure all applicable codes, regulations, and laws (electrical, building, safety) are adhered to.
8. Ensure the environmental requirements of this unit are met.
9. Install the unit at a height which meets the ADA/DDA/CSA accessibility regulations for the state/

country installed. Refer to Appendix B.

s

ite

C

oMplianCe

SITE PREPARATION CHECKLIST

Select site and design a floor plan

Ensure environmental conditions met

Establish contractor and vendor schedules

Check communication line requirements

Plan installation accessory needs

Check floor plan and make necessary

alterations

Install electrical requirements

Prepare site for communication needs

Plan operator training (optional)

Install communication lines and test

Ensure installation accessories are available