Pre-wet flow rates linked and un-linked – SnowEx PWS-225 User Manual
Page 29
![background image](/manuals/364908/29/background.png)
© Trynex International 2010 L1217
AS — 29
Pre-Wet Flow Rates Linked and Un-Linked
V-Maxx Auger
Gallons Per
Speed Setting
Ton
10
4.40
15
4.69
20
4.98
25
5.27
30
5.57
35
5.86
40
6.15
45
6.45
50
6.74
55
7.03
60
7.33
65
7.62
70
7.91
75
8.20
80
8.49
85
8.72
90
8.80
99
9.00
AccuSpray
Gallons
Control Setting
Per Minute
0.30
.43
0.40
.49
0.50
.55
0.60
.65
0.70
.71
0.80
.79
0.90
.85
FULL ON .90
HOW TO USE THE MATERIAL PRE WET SYSTEM WHEN LINKING
THE VMAXX CONTROL TO THE ACCUFLOW CONTROL.
LINKED: When you connect the two controls together using the 8" supplied
data cable, the V-Maxx control will send a signal from the the data port based
on what position the auger dial is set to. When linking the two together,
this disables the knob function of the Accufl ow control. The system is set to
deliver an optimum amount of liquid based on the amount of the material you
are spreading. This will help minimize wasting pre-wetting materials.
UN-LINKED/STANDALONE: You have the option not to connect the two
controls together and adjust your fl ow rate using the Accufl ow control knob.
POWERING UP THE SYSTEM LINKED: Set Accufl ow control to V-Maxx and
then to Pre-wet, then power up the V-Maxx control, set auger and spinner
rates, power on the Accufl ow control to begin the pre-wetting operation.
POWERING UP THE SYSTEM UN-LINKED OR STAND ALONE SYSTEM: Set
Accufl ow control to standard then set to Pre-wet, start spreader system up.
Power on the Accufl ow control to begin the pre-wetting operation.
Rotate rotary nozzles to OFF positon and move selector valve so that it is in
line with supply hoses. This will allow only the chute nozzle to operate.
Model # PWS-175/PWS-225