beautypg.com

Stuart Turner Monsoon U1.5 bar Twin User Manual

Page 20

background image

- 20 -

Cont ...

8.11

Dry Run Protection: This pump is fitted with a PCB that will detect the following

fault

conditions:

Dry running caused by water starvation to the pump.

Should the pump run out of water it will stop as part of a “protective logic

sequence”.

The fault should be rectified before re-starting the pump. Check that there is

sufficient water supply to the pump and also ensure that all terminal fitting outlets

are

closed.

8.12

Protective Logic Sequence: If water starvation occurs and the power supply

to the pump remains uninterrupted, the pump controller will perform the following

protective

sequence.

1) If the pump detects water starvation, it will stop operation after a 1 minute

period.
2) The pump will remain in the off condition for a period of 5 minutes.
3) The pump will then re-start and if the water starvation condition remains

present, the pump will then stop operation after a 1 minute period.

4) The pump will remain in the off condition for a period of 5 minutes.
5) The pump will then re-start and if the water starvation condition remains

present, the pump will then stop operation after a 1 minute period.

6) The pump will remain in the off condition for a period of 5 minutes.
7) The pump will then re-start and if the water starvation condition remains

present, the pump will then stop operation after a 1 minute period.

8) After three consecutive resets are performed the pump will remain in the off
condition

indefinitely.

9) To restart the pump, the power supply should be first isolated for a period of at

least 10 seconds before switching on again.

If the pump fails to operate normally after three attempts to re-start, then please
consult Stuart Turner Pump Assist 0844 9800097.

8.13

Fault Finding: The PCB is also fitted with a “power on” indicator light. This will

remain illuminated when mains power is supplied to the board.

The indicator light is located on the PCB within the terminal box.

This operation should only be carried out by a competent

person

To view the light the following procedure must be followed:-

Isolate the mains electrical power supply from the pump.

Remove the four screws retaining the terminal box lid (Fig. 16).

Lift the terminal box lid off.