beautypg.com

Single-phase output, Phase, 2-leg output – Watlow DIN-A-MITE Style C User Manual

Page 14

background image

14

WATLOW DIN-A-MITE Style C User's Manual

з

У

1

WARNING:
Use National Electric
(NEC) or other country-
specific standard wiring
practices to install and
operate the DIN-A-MITE.
Failure to do so may result
in damage to equipment
and property, and/or injury
or loss of life.

Ó

2

WARNING:
Wiring examples show L2
in phase-to-phase, 200V
Å
(ac) and above
configuration. In phase-to-
neutral, 100V
Å (ac) and
above applications, L2 is
neutral and must not be
fused or switched. Failure
to follow this guideline
could result in personal
injury or death.

Ó

3

WARNING:
Only authorized and
qualified personnel should
be allowed to install and
perform preventive and
corrective maintenance on
this unit. Failure to follow
this guideline could result
in damage to equipment,
and personal injury or
death.

Torque Guidelines

• Properly torque line and
load terminals to 2.7 Nm
(24 in-lb).

• Retorque after 48 hours
to minimize wire cold flow.

• Retorque line and load
terminals every 3 to 6
months.

L1

L2

Limit Control

Contacts

(if required)

Semiconductor Fuse

Phase-to-phase
200V~ (ac)
and above

7
8
9

10
11
12
13
14
15
16
17
18
19
20

Gain

Bias

Open

Heater

Limit

+

-

+

-

+

-

ALM

ALM

CT1

CT1

CT2

CT2

CT3

CT3

Adjustment

Potentiometers

Signal

Alarm

4 5 6

1 2 3

In

te

rn

a

l

B

u

s

b

a

r

L1

Neutral

Phase-to-neutral
100V~ (ac)
and above

Zone

1

Zone

2

Zone

3

Heater

Single-phase Output

з
У

1

У

2

У

3

L2

L1

L3

T1

T2

T3

Limit Control

Contacts

(if required)

Semiconductor Fuses

7
8
9

10
11
12
13
14
15
16
17
18
19
20

Gain

Bias

Open

Heater

Limit

+

-

+

-

+

-

ALM

ALM

CT1

CT1

CT2

CT2

CT3

CT3

Adjustment

Potentiometers

Signal

Alarm

In

te

rn

a

l

B

u

s

b

a

r

4 5 6

1 2 3

Zone

1

Zone

2

Zone

3

Heater

3-phase, 2-leg Output

з
У

1

У

2

У

3

(Model DC1 _ - _ _ _ _ - _ _ _ _ )

(Model DC2 _ - _ _ _ _ - _ _ _ _ )