Lincoln Electric 718113 Spirit II 150 User Manual
Page 118
Section 6: Maintenance &Troubleshooting
Spirit II User’s Manual
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
6-12
8. With a start signal applied, check the three phase voltage input to each chopper at
the diode bridge terminals (three screws on the left side of each chopper). Refer to
TABLE 1 for the proper three phase AC voltage.
Note that the system will only energize for approximately two seconds each
time a start signal is applied.
If the voltage is not present, check for primary voltage on the main contactor
(CON 1) and on the primary side of the power transformer.
Top View of Chopper
9. With a start signal applied, check for the proper DC voltage (refer to TABLE 1) at the
output terminal block between Electrode and Work.
If the proper DC voltage is present, the chopper is working properly.
TABLE 1
Chopper 1
Chopper 2
Chopper 3
3 Phase
AC
OCV
(DC)
3 Phase
AC
OCV
(DC)
3 Phase
AC
OCV
(DC)
Spirit II
400 Amp
255
370
255
370
255
370
Spirit II
275 Amp
225
325
225
325
N/A
N/A
Spirit II
150 Amp
208
300
N/A
N/A
N/A
N/A
Diode Bridge Terminals
Chopper PCB
J1 Plug