3 pre-installation preparation, 1 system planning, 2 tools – IEI Integration EC-1040G User Manual
Page 33: Installation, Reparation, Table 4-1: packing list

EC-1040GB Workstation
Page 23
Quantity Description
Image
1 Touch
pen
Table 4-1: Packing List
4.3 Pre-installation Preparation
4.3.1 System Planning
User supplied CPU cards and backplanes or motherboards need to be installed in the
system before installing the EC-1040GB rackmount workstation.
The backplane determines the following system parameters:
CPU card type
Expandability
The CPU card determines the following system parameters:
CPU
Embedded
graphics
System
memory
HDD, FDD and optical drive connectivity and capacity
Speed
It is therefore proper to correctly specify the system before the system is installed. This
ensures that prudent selections can be made when the system is being developed.
4.3.2 Tools
Before installing the EC-1040GB rackmount workstation, make sure the following tools are
on hand:
Philips (crosshead) screwdriver: All the retention screws on the system are
Philips screws.
Soft working mat: When installing the EC-1040GB rackmount workstation, the