2 installation checklist – IEI Integration PM-945GSE User Manual
Page 55
PM-945GSE-N270 User Manual
Page 55
o
When working with the PM-945GSE-N270, make sure that it is
disconnected from all power supplies and that no electricity is being fed
into the system.
Before and during the installation of the PM-945GSE-N270 DO NOT:
Remove any of the stickers on the PCB board. These stickers are required for
warranty validation.
Use the product before verifying all the cables and power connectors are
properly connected.
Allow screws to come in contact with the PCB circuit, connector pins, or its
components.
4.2.2 Installation Checklist
The following checklist is provided to ensure the PM-945GSE-N270 is properly installed.
All the items in the packing list are present
A compatible memory module is properly inserted into the slot
The CF Type I or CF Type II card is properly installed into the CF socket
The jumpers have been properly configured
The PM-945GSE-N270 is inserted into a chassis with adequate ventilation
The correct power supply is being used
The following devices are properly connected
o
SATA drive
o
RS-232 devices
o
RS-422/485 devices
o
Keyboard and mouse
o
LAN
o
LCD backlight
o
Power
o
LVDS LCD screen
o
VGA display
o
USB port