beautypg.com

Nbox/enc2/s installation instructions, 5 replacing the battery, 4 installation instructions - configuration – TREND NBOX_ENC2_S User Manual

Page 8: 6 disposal

background image

8

NBOX/ENC2/S Electricty Meter Node Controller Installation Instructions TG200270 Issue 1/E 11/10/07

NBOX/ENC2/S

Installation Instructions

Manufactured for and on behalf of the Environmental and Combustion Controls Division of Honeywell Technologies Sàrl, Ecublens, Route
du Bois 37,Switzerland by its Authorized Representative, Trend Control Systems Limited.

©Trend Control Systems Limited 2007. Trend Control Systems Limited reserves the right to revise this publication from time to
time and make changes to the content hereof without obligation to notify any person of such revisions or changes.

Trend Control Systems Limited

P.O. Box 34, Horsham, West Sussex, RH12 2YF, UK. Tel:+44 (0)1403 211888 Fax:+44 (0)1403 241608 www.trend-controls.com

Trend Control Systems USA

6670 185th Avenue NE, Redmond, Washington 98052, USA. Tel: (425)897-3900, Fax: (425)869-8445 www.trend-controls.com

WEEE Directive :

At the end of their useful life the packaging,
product, and batteries should be disposed of
by a suitable recycling centre.

Do not dispose of with normal household waste.
Do not burn.

L1

L2

L3

N

LO

AD

1 2 3 4 5 6 7 8 9 10

TX

RX

OK

1

2

Check system

18

EM-MPO/..

Lan

A
V

kW

ENC2/S

5 Replacing the Battery

1

Replacing the Battery

This should only be undertaken by a qualified IQ System
Engineer as it involves a hot-replacement method. The
meter interface script program (TCL) is lost if the battery
is removed during power down. Contact your IQ system
representative for advice.

4 Installation Instructions - Configuration

(continued)

17

Backup

SET

ENC2/S

X.IQF

SET Engineering Manual
TE200147

ENC2/S

6 Disposal