Connect batteries, Wiring – LiftMaster CSW24V High-Cycle Commercial DC Swing Gate Operator User Manual
Page 24

22
J15 Plug
Jumper
Black Wire
Red Wire
The batteries are charged in the circuit by the integrated transformer. The batteries
are for battery backup.
1
Turn OFF AC power to the operator.
2
Unplug the J15 plug labeled BATT on the control board by squeezing the plug
and pulling it from the control board. This disconnects the ac/dc power to the
the control board.
3
Connect a jumper between the positive (+) terminal of one battery to the
negative terminal (-) of the other battery.
4
Connect the red wire from the J15 plug to the positive (+) terminal of the
battery.
5
Connect the black wire from the J15 plug to the negative (-) terminal of the
battery.
6
Plug the J15 plug back into the control board. This will power up the control
board. NOTE: You may see a small spark when plugging the J15 plug into the
board.
7
Turn ON AC power to the operator.
8
Turn ON the AC power switch on the operator.
7AH BATTERIES
CONNECT BATTERIES
AC POWER SWITCH + CONNECT BATTERIES
WIRING
AC POWER SWITCH
The AC Power switch on the operator will turn the incoming 120/240 Vac power ON
or OFF. The operator's AC Power switch ONLY turns off AC power to the control board
and DOES NOT turn off battery power.
AC Power Switch