Installation, Standard installation only continued – LiftMaster CSW24V High-Cycle Commercial DC Swing Gate Operator User Manual
Page 16

14
STANDARD INSTALLATION ONLY
CONTINUED...
CONCRETE PAD AND OPERATOR ATTACHMENT
Check the national and local building codes before installation. NOTE: When lifting
the operator use the handle to avoid damaging the operator.
1
Install the electrical conduit.
2
Pour a concrete pad (reinforced concrete is recommended). The concrete pad
should be 6 inches above the ground and deeper than the frost line. Ensure the
pad is tall enough to avoid possible flooding.
3
Secure the operator to the concrete pad with appropriate fasteners.
NOTE: An alternative to a concrete pad is to post mount the operator (refer to
accessories).
4 Concrete Anchors
1/2” x 3 1/2”
Below the frost line.
Check all national
and local codes.
6” Above Ground
28”
24”
1
2
3
Post Mount
INSTALLATION
STANDARD INSTALLATION ONLY
CONDUIT LOCATION
MOUNTING FOOTPRINT
5.5”
4.5” 1”
6.5” 4”
1.5”
10”
3”
28”
20”
15”
24”
13.6”
12.2”
6.1”
2.49”
14”
14.82”
(cover mounting distance)
(Conduit)
(Pad)