beautypg.com

Harrington Hoists and Cranes CF Hand Chain Hoist User Manual

Page 28

background image

28

6) Insert the end of the load chain [42] to the bottom hook [4] and fix them with the chain pin [7],

slotted nut [8] and split pin [9]. For Bullard , Shur-loc , or Inspection type hooks, refer to

Table 6-

3 for yoke nut torque specifications.



:

Always bend the split pin securely.

Figure 6-3 Bottom Hook Assembly

7) Place the load chain [42] on the load sheave [18] so that the bottom hook side comes to right hand

and the end link of the other side becomes vertical to the load sheave pocket.



:

Put the welded part of the vertical chain link outward.

Figure 6-4 Load Chain Assembly

8) Put chain guide [20] (or guide rollers for ½ ton [20-A]) on the frame [13].



:

Fit the larger boss of chain guide [20] into holes on frame [13].

9) Put stripper [21] on the frame [13].

10) Insert pinion [14] shaft from its gear side through the frame [13] and into ball bearing B [16].

11) Insert top pin [3] into the frame [13] and put top hook [1] to the top pin. For Bullard , Shur-loc ,

or Inspection type hooks, refer to Table 6-3 for yoke nut torque specifications.