Pre-installation checklist, Unpacking – Fairbanks Aegis Drum Scales User Manual
Page 12
Section 2: Scale Installation
04/10
12 51190 Rev. 2
2.1.2. Pre-Installation Checklist
The following points should be checked and discussed with
the Area Sales Manager and/or customer, if necessary,
before the technician goes to the site and installs the
equipment.
Check the customer's application to make certain it is
within the capabilities and design parameters of the
equipment.
Be sure that the equipment operator(s) are available for training.
2.1.3. Unpacking
Follow these guidelines when unpacking all equipment:
Check in all components and accessories according to the customer's order.
Remove all components from their packing material, checking against the invoice
that they are accounted for and not damaged.
Advise the shipper immediately, if damage has occurred.
Order any parts necessary to replace those which have been damaged.
Keep the shipping container and packing material for future use.
Check the packing list.
Collect all necessary installation manuals for the equipment
and accessories.
NOTE:
It is the owner's responsibility to document, notify, and
follow-up regarding shipping damage with the carrier.