Page 2, Front – Earthway 2150T Commercial Tow Broadcast Spreader User Manual
Page 2
FRONT
Gearbox &
Axle Assembly
Drive wheel side
Coast wheel side
Frame brace
1/4-20 x 1½”
Hex Head Bolt
Step 6B & 6C
1/4-20 x 2¼”
Hex Head Bolt
Step 6A
1/4-20 Locknut
Impeller
Cross Brace
Dimples
Frame
Lower Handle
Pivot Rod
Shut-Off
#14 x 1½”
Flat Head Screw
3. Install impeller onto pinion shaft. Insert 1/8”x 1¼” cotter pin through
impeller then through pinion shaft. Use hole closest to the gear box. Spread
cotter pin to prevent from falling out. Next insert the Cross Brace through the
Gearbox Brace as shown above.
Pinion
Shaft
⅛ x 1¼”
Cotter Pin (#36105)
DRIVE WHEEL
HOLE
COAST WHEEL
HOLE
Impeller
Cross Brace
Gearbox & Axle Assembly
Gearbox Brace
Front
4. Install gear box by inserting the pinion shaft into hole in center of
hoppers bottom. The word “FRONT” on the gearbox must point to
Front of the hopper. Follow label instructions on hopper.
Axle Bearing
Flat
Side
Notch
5. Install axle bearings to both lower
handles. NOTE: Notch on bearings and
lower handles. Bearings must go through
flat side of lower handle.
6. A - Install lower handles onto axle
to both sides as shown. Insert 2¼” bolt
through second hole in lower handle and
through first hole in frame install locknut.
DO NOT TIGHTEN.
B - Now insert 1½” bolt through first hole in lower handle. Then through frame brace. NOTE: Dimples on frame brace must be facing
toward gear box as shown. Next into threaded connector in cross brace. DO NOT TIGHTEN.
C - Next insert 1½” bolt through other end of frame brace and through second hole in frame install the second cross brace - this one has a
cross hole in the center of the tube.
NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS STARTING WITH FIRST STEP.
DO NOT OVER TIGHTEN.
PAGE 2