beautypg.com

Page 4 – Earthway 2150 Commercial Broadcast Spreader User Manual

Page 4

background image

Control Rod

Tabbed Hole

Control Rod

Lever

Tension Nut

Gauge & Lever

30

1/4 - 20 Lock-nut

1/4 - 20 x 2” Bolt

Pivot Bracket

Long End

Holes are farther

from one end

Handle Shaft

14. Install (1) 1/4-20

regular nut (not a locknut)

on to control rod as

shown.

15. Install flattened end of control rod in to lever on gauge as shown. Turn to lock in place. Next push lever forward to setting “0”. Align

control rod with hole in pivot bracket, pull lever backward to insert control rod through hole in pivot bracket. Now install 1/4-20 regular nut

on to control rod.

16. Pull lever back to setting “30” as shown. Next push pivot & bracket forward so that the shut off plate in the hopper is in the full open

position. REMEMBER SETTING “30” ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT-OFF PLATE IN THE FULL

OPEN POSITION TO BE PROPERLY CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in calibration.

17. Tension on the flow control lever may be adjusted by tightening or loosening the tension nut as shown.

¼

-20

Hex Nuts

Pivot

Bracket

Control

Rod

Pivot

Rod

18. Insert agitator to pinion shaft on inside of hopper. NOTE: the

position of flat side of the agitator in the drawing. The agitator should

be installed as shown.

PAGE 4

13. Install handle shaft to lower handles and pivot & bracket assembly as shown. Using 2” bolts and locknuts.

TIGHTEN BOLTS AND NUTS NOW.