Earthway 2100P Estate Broadcast Spreader User Manual
Page 4
¼-20 x 1½”
Hex Bolts
¼-20 Lock
Nuts
¼-20 x 1¾”
Carriage Bolt
¼-20 Hex
Nut
Upper Handle
Assembly
Draw Bars
12. Install Control Assembly onto Upper Handle by sliding the Control Assembly over
Upper Handle shaft then securing with ¼-20 x 1¾” Carriage Bolt and ¼-20 Hex Nut.
TIGHTEN BOLTS AND NUTS NOW.
m
akE
surE
to
Position
thE
c
ontrol
a
ssEmBly
w
irE
above
thE
d
raw
B
ar
and
u
PPEr
h
andlE
assEmBly
as
shown
.
13. c
aliBration
-
this
stEP
EnsurEs
that
your
2100P
is
P
roPErly
adjustEd
to
givE
you
a
corrEct
starting
Point
to
aPPly
matErials
at
thE
corrEct
sEtting
. n
ow
turn
thE
sPrEadEr
ovEr
on
to
thE
hoPPEr
. With the spreader resting on it’s hopper
push the Control Handle forward to #30, then push the shut-off plate forward until the
shut-off and the drop holes are fully open. Now tighten the #10 Screw on the Lower
Housing Clip firmly. Check to confirm calibration by closing the Control Handle, then
reopening to #30 and confirm that the drop holes are fully open.
14. Insert agitator to pinion shaft on inside of hopper.
Note: the position of flat side of the agitator. This pin
should be installed as shown.
PAGE 4
11. Install Upper Handle between Draw Bars. Insert ¼-20 x 1½” bolts through Draw Bar
and Upper Handle and secure with ¼-20 Lock Nuts. TIGHTEN BOLTS AND NUTS
NOW.
Lower Housing Clip
Control Wire
Shut-Off
#10 Screw
Larger Hole
Open to #30
to calibrate