Operation, Opera t ion – Alamo FC-0002 User Manual
Page 61
OPERATION
SAMURAI 12/08
Operation Section 3-13
©2008 Alamo Group Inc.
OPERA
T
ION
BOOM ARM ASSEMBLY
•
Inspect condition of each arm section weldment
•
Ensure all pins are in place.
•
Ensure all bolts and screws are properly
installed.
•
Check condition of teflon bushings at boom
pivot points.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-B- 0022
Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.
(SG-20)
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve weldment.
•
Ensure fitting is properly connected
•
Inspect condition of nylon bushings.
OPS-B- 0023
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil and
fuel are explosive and their presence could present a hazard. Do not
check for leaks with your hand! High-pressure oil streams from breaks in
the line could penetrate the skin and cause tissue damage including
gangrene. To check for a hose leak, SHUT the unit ENGINE OFF and
remove all hydraulic pressure. Wear oil impenetrable gloves, safety
glasses and use Cardboard to check for evidence of oil leaks. If you
suspect a leak, REMOVE the HOSE and have it tested at a Dealer. If oil
does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.
(SG-15)