Fulton Ancillary Equipment SteamPac Unfired Steam Generators User Manual
Page 8

Fulton Thermal Corp.*SteamPac Unfired Steam Generators Manual* Version 2010-0201
Page 8
Rigging your heater into position should be handled by a competent rigger experienced in
handling heavy equipment.
The customer should examine the unit for any damage.
Note
All factory piping flanges should have bolts re-torqued before filling of system as bolts may
loosen in shipping.
Note
All unions on piping should be tightened prior to operation.
For Your Safety
The following WARNINGS, CAUTIONS and NOTES appear in various chapters of this manual. They are
repeated on these safety summary pages as an example and for emphasis.
• WARNINGS must be observed to prevent serious injury or death to personnel.
• CAUTIONS must be observed to prevent damage or destruction of equipment or loss of
operating effectiveness.
• NOTES must be observed for essential and effective operating procedures, conditions, and as a
statement to be highlighted.
It is the responsibility and duty of all personnel involved in the operating and maintenance of this
equipment to fully understand the WARNINGS, CAUTIONS and NOTES by which hazards are to be
eliminated or reduced. Personnel must become familiar with all aspects of safety and equipment prior to
operation or maintenance of the equipment.
Caution
Some soaps used for leak testing are corrosive to certain types of metals. Rinse all piping
thoroughly with clean water after leak check has been completed.
Note
Where a condensate return tank is to be fitted, this should:
1. Be vented
2. Have a capacity sufficient to satisfy boiler consumption as well as maintain proper
return tank temperature.