Fulton Ancillary Equipment SteamPac Unfired Steam Generators User Manual
Page 7

Fulton Thermal Corp.*SteamPac Unfired Steam Generators Manual* Version 2010-0201
Page 7
Section 1 – Safety Warnings & Precautions
This manual is provided as a guide to the correct operation and maintenance of your Fulton SteamPac
Unfired Steam Generator, and should be permanently available to the staff responsible for the operation
of the SteamPac.
These instructions must not be considered as a complete code of practice, nor should they replace
existing codes or standards which may be applicable.
The requirements and instructions contained in this section generally relate to the standard Fulton
SteamPac Unfired Steam Generator. When installing a packaged unit, this entire section should be read
to ensure that the installation work is carried out correctly.
Prior to shipment, the following tests are made to assure the customer the highest standards of
manufacturing:
a) Material
inspections
b) Manufacturing process inspections
c) ASME welding inspection
d) ASME hydrostatic test inspection
e) Electrical components inspection
f) Operating
test
g) Final engineering inspection
h) Crating
inspection
Note
The installation of Fulton SteamPac Unfired Steam Generators should be carried out by
competent personnel in accordance with the standards of the National Fire Protection
Association, National or Canadian Electrical Code. All state and jurisdictional codes beyond the
scope of the applicable ASME Boiler and Pressure Vessel Codes, for its corresponding
classification, should be followed in all cases. Jurisdictional authorities must be consulted prior
to installation.
All units are crated for fork lift transport. Once uncrated, all units can be transported with a
forklift. Under no circumstances should weight be allowed to bear on the jacket, control panel, or
fan housing of any Fulton equipment.