DAILY START-UP for INFUSION UNIT
ACTIVITIES MUST BE DONE IN THE SEQUENCE SHOWN, AND MUST BE CHECKED
OFF AS COMPLETED.
ACTIVITY
NO.
ACTIVITY
CHECK AS
COMPLETED
Priority
Put on Respirator as specified for spray painting, Protective Clothing,
Eye Protection, and PVC Gloves
1
Check all hoses for damage.
2
Check all material supplies and fill or replace as needed.
3
Close the flush tank relief valve
4
Open recirculation valve on Catalyst Manifold
4
Open main inlet air valve on the manifold.
5
Remove the Pivot Pin from the catalyst drive.
6
Manually pump the catalyst pump with the catalyst drive, observe catalyst
returning to the catalyst jug, pump until the stream is air free.
7
Close recirculation valve on Catalyst Manifold.
8
Manually pump the catalyst pump with the Slave Arm drive, bring catalyst
pressure to operating pressure 100 – 200 psi.
9
Check resin pump pressure, if needed press and hold the priming button
while slowly turn up the pump air pressure to the desired operating pressure.
10
Replace the Pivot Pin into the catalyst pump drive.
11
Insert the Distribution Ring into the Mix Chamber locating rim.
12
Place mix housing Seal into the Mix Chamber locating rim.
13
Insert the Catalyst Injector and injector seal into the aperture in the
Distribution Ring. The spring goes into the gun block.
14
Place Mix Chamber and Catalyst Injector onto the front of the Pro Gun,
secure it with the 2 screws.
15
Apply a small amount of Red Grease to the threads of the Mix Chamber.
16
Install turbulent mixer into the mix chamber and Mixer assembly onto the
mix chamber.
THE UNIT IS NOW READY FOR USE
ABNORMAL CONDITIONS OBSERVED AND CORRECTED
Abnormal Condition
a
a
a
a when
corrected
OPERATORS NAME ________________________________DATE: _________