beautypg.com

Magnum Venus Plastech System One FRP 1100-1-1 User Manual

Page 9

background image

FRP SystemOne

6

2. Assemble Cart.

a. Attach Handle to Cart.

3. Assemble Pump and Column Assembly to cart.

a. Insert Column into column support hole in top of cart.
b. Orient the column until pump faces the front of the cart.
c. Tighten the lock screws to retain pump/column assemble to cart.

Lock screws are located under cart on the front side.

4. Assemble Boom, Hoses, and Gun Assembly to pump column.

a. With the boom folded, hose coiled, and gun attached as the

assembly comes out the crate. Lift the boom up and insert the
base pivot over the column.

b. With the boom installed on column. Remove the ties holding the

two sections of boom together.

c. Remove the ties that hold the gun and hoses in the coil. Take care

not to drop the gun.

d. Remove the boom spring from the diagonal angle support at the

base of the boom.

e. Swivel the boom back over the rear of the cart (barrel location

area). Unfold the boom sections so both inner and outer sections
are straight over back of cart.

f.

With the boom sections stretched out to their full reach. Attach
one end of the boom extension spring to the support chain at-
tached at the boom knuckle.

g. While lifting the outer section of the boom upward, attach the other

end of the extension spring to the link welded to the top of the
outer boom.

h. With the outer section of the boom supported by the spring and

chain. Fold the outer section of the boom parallel to the inner
section.

5. Assemble Resin Filter/Surge Chamber Assembly to Pump.

a. Check to make sure all Filter/Surge Chamber connections are

tight.

NOTE

If Outer section of boom and gun hang to close the floor. Lift
the outer section of the boom again and attach the extension
spring to a new location on the support chain. Shortening the
chain will raise the outer section of the boom.