beautypg.com

Magnum Venus Plastech System One FRP 4102-00-01 User Manual

Page 11

background image

FRP SystemOne

8

20. Place the 9201-1-7 (7/32” SS Ball) down inside the 4101-15-1

(Check Valve Body) through the double threaded side.

21. Install the 4101-16-1 (Compression Spring) into the 4101-15-1

(Check Valve Body) onto the top of the 9201-1-7 (7/32” SS Ball).

22. Screw the 4101-17-1 (Spring Retainer) into the inside of the

4101-15-1 (Check Valve Body) compressing the Spring between
the Retainer and the SS Ball.

23. Place a 7301-9-013 (O-Ring) over the single threaded end of the

4101-15 1 (Check Valve Body), and screw the Check Valve into the
4101-14-1 (Outlet Body).

24. Place a 7301-9-013 (O-Ring) over the double threaded end of the

4101-15-1 (Check Valve Body) until it is in the thread relief area
between the two sets of threads and against the end of the
4101-18-1 (Jam Nut).

The Metering Pump Assembly is Complete.