3-WIre TTL SOurCInG

The 3-wire TTL Sourcing configuration translates the output signal from the turbine flowmeter’s pickup coil into a

voltage value. The output of the 3-wire TTL Sourcing configuration is driven either positive or negative internally. Note

that the name “TTL” is misleading because the output switches from 0V to +Vs, not 0V to +5V as the TTL standard

indicates. In the SP714-S2i, “TTL” indicates that the output is driven in both the positive and zero volt cases. A pull-

up or pull-down resistor is optional in the 3-wire TTL Sourcing configuration; however, a resistor can be installed to

prevent damage from faults.
To connect the SP714-S2i for 3-Wire TTL Sourcing:

1. Remove the SP714-S2i housing cover.
2. Pull the SP714-S2i board from the housing for access to the TB1 terminal block and the S1 switches.
3. Attach proper cable glands and/or conduit connectors to the SP714-S2i, the pulse acquisition device, and DC power supply.
4. Run the wires (through proper conduit) between the SP714-S2i, the pulse acquisition device, and DC power supply.
5. Set the first S1 switch to the ON position and the second S1 switch to the ON position.
6. Splice the resistor onto the +V

leg from the DC power supply.

This step is optional. The value of the

resistor can be determined using the

information below.

7. Wire the SP714-S2i to the pulse

acquisition device and DC

power supply as indicated in the

schematic.

8. If necessary, adjust the input

signal sensitivity (R1), activate the

diagnostic test oscsillator (SW2),

and/or check the diagnostic

operational LEDs (D1 & D2). See

page 11.

9. Coil the wires underneath the

CPU board and place the board

inside the housing, ensuring

the wires are not pinched, and

replace the housing cover.

3-WIre TTL SOurCInG WIrInG

S1

ON

ON

1 2

GND

1

3 2 1

Signal

+V

0V

S1

Signal Ground

Position 1 - ON

Position 2 - ON

ON

ON

1 2

DC Power

Supply

Resistor (R

P

)

Electronic Register

or

Flow Computer

Chassis GND

Cable Shield

3 2 1

2 1

TB2

Pickup Coil Signal

TB1

INTERNAL OPERATING PRINCIPLE

optional

Three

Conductor

Shielded

Cable

Connect Chassis GNDs at pulse acquisition device only

sP714-s2i connections

Pulse Acquisition Device

Signal

Signal Ground

Sponsler IT 400

TB2 (1)

TB2 (2)

LectroCount
LCR-II/LCR 600

J8 (33)

J8 (37)

Toptech MultiLoad

TB2B (V+ any)

TB2B (V COM any)

Maximum Cable Length: 1000 m (3280’)
Minimum Wire Gauge: 0.75 mm

2

(18 AWG)

Limit total system current to

50 mA

I

max

=

For 24 VDC operation pulse acquisition device impedance must be at least

1200 Ω

For 5 VDC operation pulse acquisition device impedance must be at least

250 Ω

Resistor

(R

P

)

Power Dissipation

P =

Resistor Value - 3-wire TTL Sourcing

24 VDC Power Supply: R

p

= 680 Ω, 1 W

12 VDC Power Supply: R

p

= 330 Ω, 1 W

5 VDC Power Supply: R

p

= 12 Ω, 2.5 W

Recommended Resistor Value (R

p

)

V

dc

R

P

(V)

2

R

P

9