beautypg.com

Concrete pad placement for sl-150dc – Controlled Products Systems Group AOMSL1501HPDC User Manual

Page 7

background image

6

CONCRETE PAD PLACEMENT

FOR

SL-150DC

24”

24”

16.25”

16.25”

30”

30”

7.5”

7.5”

FOUR RED HEAD
BOLTS ½”X 3 ½”

Area for conduit(s)

GATE TRACK

GATE

GATE TRACK

FOOTING

Minimum 5”

10”

8”

24”

4”

When possible

Install 4” above

ground level

Footing for gate operator

Gate track

Footing

Drive chain level

15”

15”

20”

20”

25”

6”

2½”

2 ”

½

Drive chain level for Rear
mount

This manual is related to the following products: