beautypg.com

H = height of cover (ft) 120 lb/ft, Simulates 20 ton truck traffic + impact – Carlon External Load Calculation for Buried Conduit User Manual

Page 4

background image

EXTERNAL LOAD CALCULATIONS FOR DIRECT BURIED CONDUIT

25701 Science Park Drive

Cleveland, Ohio 44122

216-464-3400

1-800-3CARLON (322-7566)

www.carlon.com

γγγγ = UNIT WEIGHT OF BACKFILL (lb/ft

3

)

H = HEIGHT OF COVER (ft)

120 lb/ft

3

IS A COMMONLY USED VALUE FOR THE UNIT WEIGHT OF

BACKFILL.

LIVE LOADS (LL) CAN BE CALCULATED BY USING THE BOUSSINESQ

FORMULA FOR A POINT LOAD AT THE SURFACE OF THE SEMI-INFINITE

ELASTIC SOIL OR BY USING THE PREDETERMINED VALUES IN THE

FOLLOWING TABLE:

LIVE LOADS ON PVC OR HDPE CONDUIT OR DUCT

(LIVE LOADS TRANSFERRED TO CONDUIT lbs/in

2

)

HEIGHT OF

COVER

HIGHWAY

RAILWAY AIRPORT

HEIGHT OF

COVER

HIGHWAY

RAILWAY AIRPORT

H (ft)

H20

1

E80

2

3

H (ft)

H20

1

E80

2

3

1

12.50

*

*

14

*

4.17

3.06

2

5.56

26.39

13.14

16

*

3.47

2.29

3

4.17

23.61

12.28

18

*

2.78

1.91

4

2.78

18.40

11.27

20

*

2.08

1.53

5

1.74

16.67

10.09

22

*

1.91

1.14

6

1.39

15.63

8.79

24

*

1.74

1.05

7

1.22

12.15

7.85

26

*

1.39

*

8

0.69

11.11

6.93

28

*

1.04

*

10

*

7.64

6.09

30

*

0.69

*

12

*

5.56

4.76

35

*

*

*

40

*

*

*

1

SIMULATES 20 TON TRUCK TRAFFIC + IMPACT

2

SIMULATES 80,000 lb/ft RAILWAY LOAD + IMPACT

Gross Automation (877) 268-3700 · www.carlonsales.com · [email protected]