8 commissioning, Warning, Caution – Elmo Rietschle L-BV7 User Manual
Page 28: Notice

610.48060.40.000
28 / 64
© Gardner Denver Deutschland GmbH
Commissioning
8 Commissioning
WARNING
Danger due to gauge pressure
and vacuum!
Danger due to escaping fluid!
Danger due to rotating parts!
The pump-motor unit may only
be put into operation when the
following conditions are met:
Fan guard and vacuum
pump/compressor housing
are mounted.
The lines to the discharge
connection, inlet connection
and operating-liquid port are
attached.
The lines and connections
have been tested for strength
and leaks.
CAUTION
If the unit is run dry, the
mechanical seal will be
destroyed in a matter of seconds!
DO NOT switch on as long as the
unit is not filled with operating
liquid!
8.1 Preparation
and
start-up
CAUTION
If the pumped gases/vapors
discharged on the pressure side
are passed on,
then it must be ensured that the
maximum discharge pressure of
1.1 bar abs. [16.0 psia] is not
exceeded!
NOTICE
Maximum permissible quantity of
water entrained via the inlet
connection:
See Fig. 13, Pg. 32.
If a shut-off device is installed in the discharge
pipe:
Make sure that the unit CANNOT be operated
with the shut-off device closed.
Fill with operating liquid:
When and how the pump-motor unit must be
filled with operating liquid the first time is
dependent on the operating mode:
For self-priming operation:
During installation.
For operation with operating-liquid feed:
After completing installation.
For operation with operating-liquid feed,
you now fill the working area of the unit with
operating liquid.
To do this, open the respective stop valve for
approx. 20 sec.:
For non-automatic operation:
Stop valve (Fig. 11, Pg. 32, Item 4).
For automatic operation:
Stop valve in the bypass pipe (Fig. 12,
Pg. 32, Item 4a).
Then proceed with commissioning as
described in the following.