beautypg.com

Discharge-volume setting, Procedure for prolonged shutdown of operation – Pump Solutions Group Neptune Solenoid-driven Diaphragm Metering Pump ARPZ-31_61_12 User Manual

Page 29

background image

28

Operation

10

SPEED(%)

0

100

90

20

P L

40

30

50 60

70

80

Discharge-volume setting

• The stroke speed can be adjusted by turning the stroke-speed adjustent dial located at the back of the pump.

Adjustable range of stroke speed: 15 to 300 strokes/min

✽ When the dial is moved while the pump is stopped, the dial setting may shift during pump operation. If this happens,

adjust the dial again.

(1) Operate the pump so that clean water or cleaning fluid is sucked in and discharged for about 30 minutes to

clean the inside of the pump head.

(2) Turn off the power completely.
(3) Place the cover over the pump to protect the pump from the build-up of dust and corrosive environments.

Procedure for prolonged shutdown of operation

Follow the steps below when shutting down the pump for a prolonged period.

To shut down the pump

(1) Check the inside of the tank for any sediment that may have accumulated, and check for signs of trouble such

as cloudy liquid. If the liquid quality has deteriorated, clean the inside of the tank, and replace all the existing
liquid with fresh chemical.

(2) Check the valve seat areas and check balls inside the joints for dirt and other foreign matter.
(3) Check the items in the section “Before operation” on page 25.

To resume operation

23-28_PZ総合取説_E.indd 28

23-28_PZ総合取説_E.indd 28

2008/02/01 9:32:18

2008/02/01 9:32:18

This manual is related to the following products: