beautypg.com

Installation, Instalación – Infinity Drain TD Series Installation Instructions User Manual

Page 4

background image

4

(C) Threaded Nipple - TNAS

(D) 2” Throat Clamp Down

Drain Body* (Two Pieces)

Waterproofing

Membrane

Mortar Bed

Subfloor

(D1)

(D2)

*Not provided by Infinity Drain kits

OPTIONAL PROCEDURE:

When drain install is required to be flush

against the finished wall, build out wall with

backer board over round clamp down drain

body (D) to compensate for the drain radius.

PROCEDIMIENTO OPCIONAL:

Cuando el drenaje sea instalado, se requi-

ere que esté completamente a la pared,

construir la pared con múltiples de placas

de cemento sobre el redondo drenaje (D)

para compensar el radial del drenaje.

OPTIONAL

PROCEDURE

Waterproofing

Membrane

Double Layer Backer Board

(D) 2” Throat Clamp Down

Drain Body* (Two Pieces)

(D1)

(D2)

*Not provided by Infinity Drain kits

Installation

1. Determine the location of the drain outlet

location. Typically linear drains span a dimen-

sion from wall to wall, against a wall or at a

shower entrance.

Instalación

1. Determine la ubicación del emplazamiento

del drenaje. Típicamente el drenaje lineal

atraviesa una dimensión de pared a pared,

contra la pared, o en una entrada de un baño.

2. If clamp down drain body (D) is not

installed. Attach drain body (D2) to existing

waste line and allow drain to recess into

subfloor.

Ensure that drain body (F) is level.

Unscrew and remove top clamp down plate

(D1) from drain body .
3. Spread a primary mortar bed across the

intended shower area. Pitch this bed in four

directions towards the drain body (D2).
4. When mortar layer is dry, perform necessary

waterproofing (PVC Liner, Rubber Liner, Lead

Pan, Copper Pan, Hot Mop, Fiberglass) as per

local code. Ensure waterproofing layer reaches

the edge of the hole in the drain body (D2).

2. Si el drenaje (D) no está instalado. Adjuntar el

drenaje (D2) a la línea de residuos existentes y

permite el drenaje a que recese en el piso. Ase-

gura, que el drenaje (D2) este

nivelado. Destor-

nilla y remueve la placa de sujeción de arriba.
3. Esparcir una primaria de capa de mortero a

través del destino o zona del baño. Lanzar la

capa de mortero en cuatro direcciones hacia

el drenaje (D2).
4. Cuando la capa de mortero este seca, realice

la impermeabilización necesaria (Forro del PVC,

cobre, panal de vidrio) según el código local.

Asegura que la capa de impermeabilización

alcance al borde del agujero en el drenaje (D2).