Installation, Instalación – Infinity Drain TD Series Installation Instructions User Manual
Page 4
4
(C) Threaded Nipple - TNAS
(D) 2” Throat Clamp Down
Drain Body* (Two Pieces)
Waterproofing
Membrane
Mortar Bed
Subfloor
(D1)
(D2)
*Not provided by Infinity Drain kits
OPTIONAL PROCEDURE:
When drain install is required to be flush
against the finished wall, build out wall with
backer board over round clamp down drain
body (D) to compensate for the drain radius.
PROCEDIMIENTO OPCIONAL:
Cuando el drenaje sea instalado, se requi-
ere que esté completamente a la pared,
construir la pared con múltiples de placas
de cemento sobre el redondo drenaje (D)
para compensar el radial del drenaje.
OPTIONAL
PROCEDURE
Waterproofing
Membrane
Double Layer Backer Board
(D) 2” Throat Clamp Down
Drain Body* (Two Pieces)
(D1)
(D2)
*Not provided by Infinity Drain kits
Installation
1. Determine the location of the drain outlet
location. Typically linear drains span a dimen-
sion from wall to wall, against a wall or at a
shower entrance.
Instalación
1. Determine la ubicación del emplazamiento
del drenaje. Típicamente el drenaje lineal
atraviesa una dimensión de pared a pared,
contra la pared, o en una entrada de un baño.
2. If clamp down drain body (D) is not
installed. Attach drain body (D2) to existing
waste line and allow drain to recess into
subfloor.
Ensure that drain body (F) is level.
Unscrew and remove top clamp down plate
(D1) from drain body .
3. Spread a primary mortar bed across the
intended shower area. Pitch this bed in four
directions towards the drain body (D2).
4. When mortar layer is dry, perform necessary
waterproofing (PVC Liner, Rubber Liner, Lead
Pan, Copper Pan, Hot Mop, Fiberglass) as per
local code. Ensure waterproofing layer reaches
the edge of the hole in the drain body (D2).
2. Si el drenaje (D) no está instalado. Adjuntar el
drenaje (D2) a la línea de residuos existentes y
permite el drenaje a que recese en el piso. Ase-
gura, que el drenaje (D2) este
nivelado. Destor-
nilla y remueve la placa de sujeción de arriba.
3. Esparcir una primaria de capa de mortero a
través del destino o zona del baño. Lanzar la
capa de mortero en cuatro direcciones hacia
el drenaje (D2).
4. Cuando la capa de mortero este seca, realice
la impermeabilización necesaria (Forro del PVC,
cobre, panal de vidrio) según el código local.
Asegura que la capa de impermeabilización
alcance al borde del agujero en el drenaje (D2).