beautypg.com

Quick start guide, Quick start guide — cveq1 series, Precautions, continued – Extron Electronics CVEQ1, CVEQ1 WM, CVEQ1 AAP User Manual

Page 4

background image

CVEQ1 Series • Quick Start Guide

QS-1

Quick Start Guide — CVEQ1 Series

CAUTION

Installation and service must be performed by authorized

personnel only. The CVEQ1 AAP and CVEQ1 WM
must be used with UL approved electrical boxes. See “UL
Requirements”, page 2-3.

To install and set up a CVEQ1, follow these steps:

Step 1

Turn the input and output devices off and unplug their power cords.

Step 2

For the CVEQ1,

go to step 3.

For the CVEQ1 AAP,

A.

Determine the installation location.

B.

If applicable, follow the site preparation (hole cutting, electrical

box installation, and cable preparation) instructions included

with the device or AAP wallplate into which the CVEQ1 AAP

will be installed.

C.

Attach the CVEQ1 AAP to the Extron device faceplate or AAP

wallplate.

For the CVEQ1 WM,

A.

Determine the installation location.

B.

Prepare the site (cut the hole, install the electrical box, and

prepare the cable).

Step 3

Attach output cables to the rear (CVEQ1)/bottom (CVEQ1 AAP)/

side (CVEQ1 WM) panel of the line driver and to the output devices.

See “Rear/Bottom/Side Panel Features and Cabling” in chapter 2.

Step 4

Attach input cables to the input devices and to the line driver’s

front panel connectors. See “Front Panel Features and Cabling” in

chapter 2.

Step 5

Connect power cords and turn on the output devices (projector/

monitor, speakers), buffer, and input devices.

Step 6

The picture should appear, and sound should be audible. If not,

ensure that all devices are plugged in and receiving power. Check

the cabling; make adjustments as needed.

Precautions, continued