Installation instructions, Operation instructions, Service instructions – Bell & Gossett V58222C Tank Purge Valve – TPV User Manual

Page 2: Xylem inc

background image

Fill

or HX

with Check

Air Vent

Air Separator

Air Vent

Gage

Diffuser

B&G System Pump

To System

B&G Triple Duty Valve

Tank Purge Valve

Series D-Vertical)

INSTALLATION INSTRUCTIONS

1. Install Tank Purge Valve between the expansion tank and the sys-

tem so that the drain valve is between the expansion tank and the

isolation valve. (The union connection is installed on the tank). The

Tank Purge Valve should be installed so that both the drain valve

handle and the isolation valve handles are easy accessible. Refer

to Figure 1. For typical installation drawings refer to Figure 2 and 3.

2.

For installing Sweat Connections:
a) Clean tube ends and valve connections thoroughly per good pip-

ing practices with a fine grade emery cloth or fine grit sandpaper.

b) For  soldering,  use  95-5  (Tin-Antimony)  solder  and  a  good

grade of flux.

c) Use a torch with a sharp pointed flame.
d) When sweating the joints, first adjust the valve in the full open

position,  then  wrap  the  valve  with  a  cool  wet  rag  and  then

direct the flame with care to avoid subjecting the valve to exces-

sive heat. Allow the valve to cool before touching or operating.

e) Check the soldered connection for leaks.

3.

For installing NPT connections: 

Apply pipe compound conservatively to male connecting fittings only.

After installation check all joints for leakage and retighten where necessary.

 

OPERATION INSTRUCTIONS

1. To drain the tank first close the isolation valve by moving the han-

dle  one  quarter  of  a  turn  until  the  handle  is  perpendicular  to  the

valve and piping. Allow the tank to cool to 100°F (38°C).

2. Remove the cap from the 

5

/

8

" drain on the drain valve and connect

5

/

8

" garden hose onto the drain valve. 

3. Move the handle of drain valve one quarter of a turn until it is inline

with the valve body and system piping. 

To  return  the  Tank  Purge  Valve  to  the  operating  position  turn  the

drain  valve  handle  until  it  is  perpendicular  to  the  valve  body  and

replace the cap onto the drain. Move the handle of the isolation valve

one quarter of a turn until it is inline with the valve body and system

piping.

SERVICE INSTRUCTIONS

Periodically  inspect  the  Tank  Purge  Valves  for  signs  of  corrosion  or

leakage.  If  steam  leakage  is  observed  the  brass  hex  packing  nut

should be tightened slightly until leak stops. If tightening the packing

nut does not stop the leak or signs of leakage are noted elsewhere,

the Tank Purge Valve must be replaced.

WARNING: Use  of  improper  procedures  to  sweat  valve 

model with union connection into system can damage valve.

Before  sweating  valve  connection,  remove  the  union  nut  and 

O-ring from the valve body. Failure to follow this instruction could

result in property damage and/or moderate personal injury.

CAUTION: Heat  associated  with  the  use  of  silver  solder 

may  damage  a  Tank  Purge  Valve  and  voids  the  product

warranty. Do  not  use  silver solder. Failure to  follow these instruc-

tions  could  result  in  property  damage  and/or  moderate  personal

injury.

CAUTION: The use of PTFE impregnated pipe compound 

and  PTFE  tape  on  pipe  threads  provides  lubricity.  Care

should be taken to prevent overtightening which may damage the

valve body. Failure to follow these instructions can result in moder-

ate personal injury and/or property damage.

WARNING: It is possible, depending on the age or condition 

of the drain valve stem seal, for some liquid to escape when

closing the valve. Do not have eyes or face directly underneath the

valve.  Failure  to  follow  these  instructions  could  result  in  serious

personal injury.

WARNING: Corrosion  or  leakage  are  indications  that  the 

shutoff  valve  may  be  about  to  cause  serious  damage.  The

Union  ended  valve  must  be  replaced.  Failure  to  follow  these

instructions  could  result  in  serious  personal  injury  or  death  and

property damage.

FIGURE NOTES

1. Tank connection locations may vary depending on the type of tank

to be installed.

2. Provide an anti-thermosyphon loop with a minimum drop of 12" to

prevent gravity heating of the tank.

3. Figures  2  and  3  show  where  a  tee  would  be  located  if  multiple

expansion tanks are installed.

Figure 2 – Vertical Tank Installation with Rolairtrol Air Separator

WARNING: Hot fluids and/or fluids under pressure are safety

hazard. Do not drain while it is hot or under pressure. Failure

to follow these instructions could result in serious personal injury or

death and property damage.

with Check

Fill

Air Vent

or HX

Separator

Diffuser

Pump

To System

B&G Triple Duty Valve

Expansion Tank

Air Vent

P

Gage

Tank Purge Valve

Figure 3 – Horizontal Tank Installation with Rolairtrol Air Separator

Xylem Inc.

8200 N. Austin Avenue

Morton Grove, Illinois 60053

Phone: (847) 966-3700

Fax: (847) 965-8379

www.xyleminc.com/brands/bellgossett

Bell & Gossett is a trademark of Xylem Inc. or one of its subsidiaries.
© 2012 Xylem Inc. V58222C September 2012