beautypg.com

Special application fuses, 242 series barrier network fuse, Average time current curves – Littelfuse 242 Series User Manual

Page 2: Part numbering system

background image

© 2014 Littelfuse, Inc.

Specifications are subject to change without notice.
Revised: 01/23/14

Special Application Fuses

242 Series Barrier Network Fuse

Average Time Current Curves

0.1

0.01

0.001

0.0001

1

10

100

TIME IN SECONDS

.050A

.080A

.100A

.200A

.125A

.160A

.250A

0.01

0.1

1

10

100

1000

CURRENT IN AMPERES

Reflow Condition

Pb – Free assembly

Pre Heat

- Temperature Min (T

s(min)

)

150°C

- Temperature Max (T

s(max)

)

200°C

- Time (min to max) (t

s

)

60 – 180 secs

Average ramp up rate (Liquidus Temp
(T

L

) to peak

5°C/second max

T

S(max)

to T

L

- Ramp-up Rate

5°C/second max

Reflow

- Temperature (T

L

) (Liquidus)

217°C

- Temperature (t

L

)

60 – 150 seconds

Peak Temperature (T

P

)

250

+0/-5

°C

Time within 5°C of actual peak Temp. (t

p

) 20 – 40 seconds

Ramp-down Rate

5°C/second max

Time 25°C to peak Temperature (T

P

)

8 minutes Max.

Do not exceed

260°C

Soldering Parameters

Product Characteristics

Dimensions

3.02

mm

(.119")

8.40

mm

(.331")

4.00mm

4.60

mm

(.181")

1.90

mm

(.075")

3.02

mm

(.119")

8.40

mm

(.331")

4.60

mm

(.181")

2.90mm

3.20mm

9.80mm

1.90

mm

(.075")

.635

mm

(.025")

Operating Temperature

–40

O

C to 125

O

C.

Thermal Shock

Withstands 5 cycles of – 55

O

C to

125

O

C

Vibration

Per MIL-STD-202F

Insulation Resistance
(After Opening)

Greater than 10,000 ohms.

Part Numbering System

0242.050UAT1

SERIES
AmP CODE

QUANTITY & PACkAgINg CODE

Refer to Amp Code column in the

Electrical Specifications table.

HAT1 = 100 pcs, Axial Leaded, Ammo Pack T1 Tape

UAT1 = 500 pcs, Axial Leaded, Ammo Pack T1 Tape

UR = 500 pcs, Surface Mount, Tape & Reel

Wave Soldering

260°C, 10 seconds max.

Time

T

e

mperatur

e

T

P

T

L

T

S(max)

T

S(min)

25

t

P

t

L

t

S

time to peak temperature

(t 25ºC to peak)

Ramp-down

Ramp-up

Preheat

Critical Zone

T

L

to T

P