Basic inlet hoppers, Spouting, fittings and truss kits, Spouting and fittings – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1445 User Manual
Page 31
4. Assembly
PNEG-1445 6", 8", 10" and 12" Custom Augers
31
Basic Inlet Hoppers
1. Follow the cutting guidelines
2. Attach hoppers to tube as shown
.
3. Follow the instructions below before cutting and installing inlet hopper.
a. Slide ring flange onto the end of tube and weld, making sure the flange is mounted squarely.
b. Bolt end plate to flange.
c. Bolt bearing to end plate.
d. Guide intake stub through bearing and tighten the lock collar.
e. Install any covers if applicable.
Figure 4AE
Spouting, Fittings and Truss Kits
Spouting and Fittings
To connect sections of spouting or to connect fittings to spouting, use one or all of the following procedures:
1. Spouting to Spouting - Slide flange rings over ends of spouting to be joined and weld in place. Make
sure flanges are mounted squarely. Join flanges and bolt together.
2. Spouting to Fitting - Install ring flange on spouting as in
. Join to flange on fitting (valve,
dead head, slip joints, etc.)
3. Flange Clamps - Fit each half over flanges and tighten with bolts provided.
4. Quick Connect Flange Clamps - Fit each half over flange and tighten bolt. Do not use in location
where permanent unions are required.