beautypg.com

Mounting bearing to bearing plate (continued), Installing bearing plate onto tube – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1445 User Manual

Page 14

background image

14 PNEG-1445 6", 8", 10" and 12" Custom Augers

4. Assembly

Mounting Bearing to Bearing Plate (Continued)

Figure 4B

Installing Bearing Plate onto Tube

1. Align bearing with drive shaft and slip shaft through bearing.

2. Rotate plate until bolt holes in tube flange and plate align. Secure with appropriate bolts and

serrated flange nuts.

(See Chart below.)

3. Only secure with UPPER and LOWER four (4) bolts.

(See Figure 4C.)

The other four (4) bolts will

be installed later with the belt guard mounting brackets.

(See Chart below.)

NOTE: On the 10" and 12" systems use the four (4) 3/8"-16 x 1" bolts in this step, the longer bolts

will be used to attach the belt guard mounting brackets in a future step.

Figure 4C

Bearing Plate Bolts

6" and 8"

5/16"-18 x 1" Bolt

10" and 12"

3/8"-16 x 1" Bolt

(

See Chart on Page 13

for bolt sizes.)

(

See Chart above

for bolt sizes.)

NOTE: Only the upper and lower
four (4) bolts are connected at
this point in the assembly
.