Introduction – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-751-G2 User Manual
Page 6
1. Introduction
6
PNEG-751-G2 12" Series II Sweep 131' and 135' Diameter
Bin opening size required
for installation.
The tail section is the largest piece of a standard Series II Sweep. The dimensions for a
12" tail section are 21-1/4" x 51-1/2". If the bin wall is not too thick, this unit should fit
through a 21-1/2" x 45" opening.
Voltage specification.
The Series II Sweep is designed to operate using 460 volt 3 phase 60 cycle power.
The voltage must be within plus or minus 4% for proper operation. Voltages outside
of this range may cause excessive power draw or other operating problems. Please
contact the factory for applications outside of these parameters.
Electrical requirements.
Electrical controls and wiring should be installed by a qualified electrician. The
conductor cables should comply with the National Electric Code and any local codes
which may apply.
Disconnect and lock out the power before servicing the equipment, entering the bin
or resetting the motor overloads.
The control panel MUST be mounted OUTSIDE the bin near the door. It must be
located so the operator has a full view of the equipment and can see that all personnel
are clear. It must NEVER be installed inside the bin. The foot switch has to be plugged
into the control panel and depressed before the sweep is operational. It has a 10' cord
so the sweep can only be monitored from OUTSIDE the bin. The thermal protection
cord must also be plugged in before the sweep will operate.
Issues
Recommendations