beautypg.com

Flighting assembly – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-751-G2 User Manual

Page 24

background image

5. Assembly

24

PNEG-751-G2 12" Series II Sweep 131' and 135' Diameter

Flighting Assembly

A. Lay out the flight sections in order of assembly starting with the head flight working towards the

tail flight.

B. Using the connecting stubs, bolt the flight sections together with hex bolts and lock nuts. Make sure

the flight ends are in time with each other.

Figure 5B

C. Slide the end stub through the bearing plate on the tail section and into the tail flight securing it with

hex bolts and lock nuts.

Figure 5C