Control panel installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1366 User Manual
Page 20
5. Assembly
20
PNEG-1366 12" and 16" Series II Sweep Quick Disconnect Control Box Kit
Control Panel Installation
1. Remove the lock nut from the conduit hub. The conduit hub is factory installed on the conduit
assembly attached to the back base assembly.
2. Carefully inset the conduit hub, with wires, into the hole drilled during
.
3. Install the lock nut on the hub and tighten.
4. Mount the control box to the back plate with the supplied hardware.
5. Use the supplied grounding lug (E160-1137) to properly ground the control box assembly to
the outlet.
Control Panel Receptacle Mounting (Current Style Panel)
Control Panel and Receptacle Installation
Open the control panel and mount it to the lift base panel assembly with the supplied hardware. There
are three (3) mounting positions on the lift base panel assembly in which to mount the control panel.
Figure 5C
Electrical controls should be installed by a qualified electrician and must meet
standards set by the National Electrical Code and all local and state codes.
A main power disconnect switch capable of being locked only in the OFF position
should be used. The disconnect must be LOCKED in the OFF position before
unplugging either end of the power cord. This has been integrated into the control
panel after June 2010.
Electrical controls should be installed by a qualified electrician and must meet
standards set by the National Electrical Code and all local and state codes.
A main power disconnect switch capable of being locked only in the OFF position
should be used. The disconnect must be LOCKED in the OFF position before
unplugging either end of the power cord. This has been integrated into the control
panel after June 2010.