Td-vip-01 data sheet selection – Grain Systems PNEG-1798 User Manual
Page 31

8. TD-VIP-01 Data Sheet Selection
PNEG-1798 Tower and T-Series Dryers Vaporizer
31
Signatures for Completion of Leak Test
Test Technician: _______________________________________ Date: _________________
Supervisor: ____________________________________________ Date: _________________
Vaporizer Pressure Leak Test Data (Continued)
Test Performers Names and Completion Date
Step #
Information
Recorded Data
Initials/Date
1. Disconnect hose at 3/4" manual valve.
2. ‘OPEN’ the valve.
3. Verify 0 PSIG on test gauge.
1.
2.
3. PSIG
1.
2.
3.
3/4" Manual isolation valve ‘CLOSED’.
0-300 PSIG test gauge and fittings removed from 2" x 1" reducer.
3 Prong cord removed from receptacle and wires disconnected from
ASCO solenoid.
Solenoid wires re-connected to field wires (If applicable)
mark as ‘N/A’ if not.
High pressure hose and regulator removed from nitrogen cylinder.
Connect the 2" x 1" fitting from the vaporizer loop to the 2" inlet fitting
of the high pressure regulator.
Verify all steps of this section are complete and initialed and signed.
Test Performer Name(s)
Company Name
Test Completion Date
Test Performer’s Initials